01 / END-TO-END WORKFLOW
How the estimate
gets built.
The workflow follows the way contractors actually receive and price work: bid invitation, current drawings and specifications, scope review, takeoff, pricing, quote reconciliation, estimate assembly, QA/QC and final delivery. The exact sequence is adjusted to the project type and the contractor's requirements.
01 / INTAKE
Receive the bid package.
We start with the documents being used to price the job: drawings, specifications, addenda, bid forms, scope sheets, finish schedules, geotechnical information when applicable, and owner or GC instructions. We confirm the bid due date, project location, scope and deliverable requirements.
BID SET / ADDENDA / BID DUE / SCOPE / DRAWINGS / SPECIFICATIONS
02 / SCOPE REVIEW
Establish the scope of work.
Drawings and specifications are reviewed together so the estimate is tied to the current document set. We identify trade responsibility, inclusions, exclusions, alternates, allowances, owner-furnished items, existing conditions and items that require clarification before pricing.
INCLUSIONS / EXCLUSIONS / ALTERNATES / ALLOWANCES / CLARIFICATIONS
03 / TAKEOFF
Measure the work.
Quantities are measured or counted from the plans and organized by trade, area, assembly or cost category. Depending on the scope, takeoff units may include SF, LF, CY, SY, EA, tons and other appropriate units. Marked-up plans can make the quantity basis easy to review.
QUANTITY TAKEOFF / LF / SF / CY / EA / ASSEMBLIES / MARKUPS
04 / COST DEVELOPMENT
Turn quantities into costs.
Quantities are paired with unit costs and production assumptions. Labor can be developed from crew rates, labor hours and production expectations; materials can be priced from current cost inputs, supplier pricing or project-specific quotes. Waste, freight and equipment are considered where required.
UNIT COST / LABOR HOURS / CREW / PRODUCTION / MATERIAL / EQUIPMENT / WASTE
05 / QUOTE RECONCILIATION
Compare subcontractor & supplier quotes.
Available trade and vendor quotes are reviewed against the drawings and scope. Quote coverage is checked so a low number is not mistaken for a complete number. Scope differences, exclusions, freight, material assumptions and missing work are identified before the estimate is carried forward.
SUB BIDS / VENDOR QUOTES / SCOPE LEVELING / QUOTE COMPARISON
06 / ESTIMATE ASSEMBLY
Build the estimating workbook.
The estimate is assembled into a practical structure for review and bidding. Line items, quantities, units, unit costs and extensions are organized by trade or cost code as appropriate. Alternates, allowances, general conditions, subcontractor costs and other required categories remain identifiable.
LINE ITEMS / EXTENSIONS / COST CODES / GENERAL CONDITIONS / ALTERNATES
07 / QA/QC
Check the estimate before delivery.
The completed estimate is reviewed for quantity coverage, mathematical accuracy, scope consistency, quote coverage, duplicate or missing line items, unusual unit costs, assumptions and documented exclusions. The goal is a clean package with the basis of pricing visible to the contractor.
QA/QC / SCOPE CHECK / MATH CHECK / ASSUMPTIONS / EXCLUSIONS
08 / DELIVERY
Deliver a bid-ready package.
Final deliverables are provided in the agreed format, commonly an organized Excel estimate with supporting quantity takeoff information and marked-up plans when included in the scope. Open clarifications and estimating notes are identified so the contractor knows what was priced and what remains to be resolved.
EXCEL ESTIMATE / TAKEOFF / MARKUPS / NOTES / BID REVIEW